What can be renovated while occupied?
Painting and plastering, new floor coverings, bathroom and kitchen renovations, facade work: the vast majority of interior and exterior work can be done while you live in the building. The key question is not whether it is possible, but how the work is divided up.
It becomes more difficult with a complete renovation, where all rooms are affected at the same time, or when pipes and cables are replaced throughout the building. In that case, we recommend arranging alternative accommodation at least for the most intensive phase.
Planning in stages
Instead of working everywhere at once, we divide the property into sections: room by room, floor by floor or apartment by apartment. Each section is completed and cleaned before the next one begins. This way, part of the building always remains untouched.
Dust, noise and access
These three factors determine how disruptive a renovation is in everyday life. Clarify them before work starts:
- Dust
- Dust protection walls and coverings on floors and stairs separate off the work area.
- Noise
- Noisy work such as chiselling or drilling can be grouped into fixed time slots that you know in advance.
- Access
- A fixed route for the team and materials helps keep the rest of the building clean.
- Cleaning
- Agree when cleaning will take place, for example at the end of each stage.
Bathroom and kitchen: the critical days
Without a bathroom or kitchen, everyday life quickly becomes tiresome. That is why it pays to plan these rooms so that the downtime is as short as possible: order materials in advance, coordinate the work sequence and only start once everything is ready.
If there is only one bathroom in the building, we discuss a temporary solution in advance, such as a temporary shower or the use of a bathroom in another apartment. For a kitchen renovation, a small cooking area in another room helps.

In apartment buildings: involve tenants early
For property managers and owners, communication with tenants is often the most important factor for success. Announce the work in writing in good time, with a schedule, the rooms affected and a contact person.