Planning a renovation7 min read

Renovating while occupied: how to keep your home liveable

Not everyone can move out during a renovation, and in apartment buildings it is rarely an option. With good planning, most work can be done while people continue to live in the building.

Valmir BerishaOwner, Beri Bau AG
Renovating while occupied: how to keep your home liveable

What can be renovated while occupied?

Painting and plastering, new floor coverings, bathroom and kitchen renovations, facade work: the vast majority of interior and exterior work can be done while you live in the building. The key question is not whether it is possible, but how the work is divided up.

It becomes more difficult with a complete renovation, where all rooms are affected at the same time, or when pipes and cables are replaced throughout the building. In that case, we recommend arranging alternative accommodation at least for the most intensive phase.

Planning in stages

Instead of working everywhere at once, we divide the property into sections: room by room, floor by floor or apartment by apartment. Each section is completed and cleaned before the next one begins. This way, part of the building always remains untouched.

Dust, noise and access

These three factors determine how disruptive a renovation is in everyday life. Clarify them before work starts:

Dust
Dust protection walls and coverings on floors and stairs separate off the work area.
Noise
Noisy work such as chiselling or drilling can be grouped into fixed time slots that you know in advance.
Access
A fixed route for the team and materials helps keep the rest of the building clean.
Cleaning
Agree when cleaning will take place, for example at the end of each stage.

Bathroom and kitchen: the critical days

Without a bathroom or kitchen, everyday life quickly becomes tiresome. That is why it pays to plan these rooms so that the downtime is as short as possible: order materials in advance, coordinate the work sequence and only start once everything is ready.

If there is only one bathroom in the building, we discuss a temporary solution in advance, such as a temporary shower or the use of a bathroom in another apartment. For a kitchen renovation, a small cooking area in another room helps.

Renovated bathroom with double washbasin in an apartment building in Zollikon

In apartment buildings: involve tenants early

For property managers and owners, communication with tenants is often the most important factor for success. Announce the work in writing in good time, with a schedule, the rooms affected and a contact person.

Covered stairwell during painting work in Baden

From our projectsPainting, 82 apartments, BadenStairwells, corridors and communal areas of a residential development. View reference →

Checklist

0 of 8 done
Planning a renovation?

We’ll plan the stages with you.

After the site visit, you’ll receive a free, no-obligation quote.

AddressBaumackerstrasse 24, 8050 Zürich