Converted apartment with an open living area, kitchen island and new tiled floor
Service 02

Conversion & renovation

Preserving what exists, creating something new: opening up floor plans, renewing bathrooms and kitchens, completely renovating apartments. From demolition to interior finishing – six trades from a single source.

42 apartments
Renovated across several apartment buildings, Egliswil
6.2 m
Steel beam for a new floor plan, Hinteregg
14
Employees in our own team
Since 2012
Our own team in and around Zurich
Process

In stages – even while occupied.

Most conversion work can be done while you live in the house. The question is not whether it’s possible, but how the work is divided up.

  1. 01

    Site visit & survey

    We survey rooms, building elements and pipes on site and clarify which areas remain occupied during the work.

  2. 02

    Staging plan

    Room by room, floor by floor or apartment by apartment. We define the stages together with you.

  3. 03

    Dust, noise, access

    Dust protection walls, fixed time slots for noisy work and a fixed route for the team and materials – agreed together before work begins.

  4. 04

    Work stage by stage

    Each section is completed and cleaned before the next one begins.

  5. 05

    Bathroom and kitchen

    Materials are ordered in advance and work only starts once everything is ready. This keeps the downtime short.

  6. 06

    Handover

    Final cleaning after each stage, joint inspection and handover.

Good to knowFor a complete renovation in which all rooms are affected at the same time, we recommend alternative accommodation for the most intensive phase.

Scope of work

What we do.

Eight tasks that regularly come up in conversions. Plastering, painting and tiling for the interior finishing come from a single source.

  • 01

    Conversions & renovations of all kinds

    A new kitchen, a modern bathroom or a new room layout – planned and carried out from a single source.

  • 02

    Demolition work

    Removing existing structures professionally without damaging adjacent building elements.

  • 03

    General masonry

    Walls, plastering and repairs to existing masonry.

  • 04

    Small masonry jobs

    Minor adjustments: raising a wall, creating a new opening, repairing damage.

  • 05

    Diamond drilling

    Precise drilling for electrical, plumbing and ventilation installations.

  • 06

    Concrete work

    Foundations, floor slabs and walls in concrete, including in existing buildings.

  • 07

    Bathroom & kitchen

    Strip-out, pipe routing, waterproofing and tiling, in stages if required.

  • 08

    Attic conversion

    Converting attics into living space, from the shell to the finished surface.

References

Conversions in practice

Complete and partial renovations of apartments, houses and commercial premises in Zurich and the neighbouring cantons.

All projects
Featured project

Complete apartment renovation

Apartment completely remodelled, including the installation of a 6.2 m steel beam.

Location
Hinteregg
Property
Apartment building
Project type
Complete renovation
Trades
Construction · Plastering · Painting · Tiling
View project
The Mini Bar underwent an impressive transformation thanks to the comprehensive renovation by Beri Bau AG. From the changes to the floor plan to the final design, every aspect of the conversion was carried out carefully and professionally. Working with Beri Bau AG was efficient, and the result speaks for itself. We are extremely satisfied with the complete renovation of our Mini Bar and recommend Beri Bau AG as a reliable partner for complex conversion projects.
Mini Bar ZurichView project
Complete renovation, Mini Bar, ZurichComplete renovation · Zurich

In most cases, yes. We divide the work into stages so that part of the house always remains untouched. For a complete renovation in which all rooms are affected at the same time, we recommend alternative accommodation for the most intensive phase.

Then we agree on a temporary solution in advance, such as a provisional shower or using a bathroom in another apartment. For a kitchen renovation, a small cooking area in another room helps.

Yes, with structural verification; we clarify this with you before the work starts. In the apartment renovation in Hinteregg, for example, we installed a 6.2 m steel beam.

We do. Six trades come from a single source, and you have one point of contact from the site visit to the final handover.

We visit the property on site. You then receive a free, no-obligation quote with itemised positions.

Quote: conversion & renovation

We plan the stages with you.

Site visit and survey covering all trades. You then receive a free, no-obligation quote. If you stay in the property, we plan the work in stages.

AddressBaumackerstrasse 24, 8050 Zürich