Shell construction, demolition and concrete work with our own team. From the foundation to the opening in a load-bearing wall — six trades from a single source, one point of contact.

Eight tasks that are part of our construction work. Anything not listed here we coordinate through our other trades.
Excavation, shoring of the building pit and foundation connection to the structural engineer’s specifications.
Formwork, reinforcement, cast-in-place concrete. Including waterproofing against ground and seepage water.
Brick, sand-lime brick and fair-faced masonry for load-bearing and non-load-bearing walls.
Columns, ceilings, stairs and lintels in cast-in-place concrete, including laying the reinforcement.
Selective strip-out in existing buildings, separated by material.
Openings for doors, windows and pipes, propped where load-bearing elements are affected.
Foundation underpinning and steel beams when load-bearing walls are removed.
Drainage, manholes, edgings and preparation of the landscaping work.
Construction work covers everything load-bearing and in contact with the ground: excavation, foundations, masonry, concrete, wall openings, demolition. Mistakes at this stage are expensive to correct later, which is why careful planning pays off here.
Any intervention in load-bearing elements requires structural verification; we clarify this with you before the work starts. You have one point of contact — from the site visit to the final handover.

The bank's premises were comprehensively modernised, with painting and plastering work and a new room layout.

Work on the oldest house in the municipality, including the facade and shell construction within the historic building.

Rendered external thermal insulation, drywall and interior finishing from a single source.
Five points that should be clarified before you sign — whichever company you choose.
Ask who carries out the work and who your point of contact is during the project.
Ask for a written quote with itemised positions and clarify under which conditions additional costs may arise.
Wall openings, underpinning and new ceilings require verification by a structural engineer. Clarify who provides it and who pays for it.
Demolition material must be separated and disposed of through licensed facilities. Ask how disposal is handled.
One name for the whole project and a schedule that you discuss together before construction begins.
Ask us about any of these points — we’re happy to advise you. Request a quote →
You always need structural verification. Whether a building permit is also required depends on the municipality and the intervention. We clarify this with you before the work starts.
That depends on the size, the construction method and the weather. After the site visit, we discuss the schedule for your project.
Yes. Demolition material is separated and disposed of through licensed collection points.
The price depends on the diameter, the wall thickness and accessibility. After the site visit, you’ll receive a free, no-obligation quote.
Your question isn’t listed? 043 399 53 35
Construction work rarely comes alone. We carry out these trades in the same project.
After the site visit, you’ll receive a free, no-obligation quote. For wall openings and underpinning, we clarify the structural verification with you before the work starts.